________Donetsk
__Ukraine
Select Languages:
The device of formation of a bell
   
____It is offered unique installations of formation of a bell for sewer pipes from any materials (PP, PE, PVC) by a dimeter of 50 and 100 mm. Installations form at once two bells on a continuous pipe with the subsequent порезкой on two separate: one pipe in length to 1 m, the second – to 2 m. All cycle раздува is carried out automatically, the operator only establishes a pipe in the car and upon termination of a cycle takes a finished article. Installations are completed with the cutting device (guillotine) and trimer.

 

The parameter name
ФР-50
ФР-110
Diameter of an inflated pipe
50
110
Time of a cycle for sewer pipes from PP (on 2 bells) roughly
60 сек
70 сек
Cycle performance
Avtomatic

The established capacity of an electric equipment, kw
3
4
Average power consumption in a cycle, kw
1,5
2
Dimensions, mm:
Length
Width
Height
1860
500
1080
2000
600
1182
Guillotine
trimer
960х590х1795

620х530х905
1200х450х1284

620х630х1000